rfc7221









Internet Engineering Task Force (IETF)                         A. Farrel
Request for Comments: 7221                              Juniper Networks
Category: Informational                                  D. Crocker, Ed.
ISSN: 2070-1721                              Brandenburg InternetWorking
                                                              April 2014


           Handling of Internet-Drafts by IETF Working Groups

Abstract

   The productive output of an IETF working group is documents, as
   mandated by the working group's charter.  When a working group is
   ready to develop a particular document, the most common mechanism is
   for it to "adopt" an existing document as a starting point.  The
   document that a working group adopts and then develops further is
   based on initial input at varying levels of maturity.  An initial
   working group draft might be a document already in wide use, or it
   might be a blank sheet, wholly created by the working group, or it
   might represent any level of maturity in between.  This document
   discusses how a working group typically handles the formal documents
   that it targets for publication.

Status of This Memo

   This document is not an Internet Standards Track specification; it is
   published for informational purposes.

   This document is a product of the Internet Engineering Task Force
   (IETF).  It represents the consensus of the IETF community.  It has
   received public review and has been approved for publication by the
   Internet Engineering Steering Group (IESG).  Not all documents
   approved by the IESG are a candidate for any level of Internet
   Standard; see Section 2 of RFC 5741.

   Information about the current status of this document, any errata,
   and how to provide feedback on it may be obtained at
   http://www.rfc-editor.org/info/rfc7221.













Farrel & Crocker              Informational                     [Page 1]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   Copyright Notice

   Copyright (c) 2014 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents
   (http://trustee.ietf.org/license-info) in effect on the date of
   publication of this document.  Please review these documents
   carefully, as they describe your rights and restrictions with respect
   to this document.  Code Components extracted from this document must
   include Simplified BSD License text as described in Section 4.e of
   the Trust Legal Provisions and are provided without warranty as
   described in the Simplified BSD License.

Table of Contents

   1. Introduction ....................................................2
      1.1. What Is a WG Draft? ........................................3
      1.2. Working Group Authority and Consensus ......................4
      1.3. Questions Considered in This Document ......................5
   2. Adoption Sequence ...............................................6
      2.1. Common Steps ...............................................6
      2.2. Criteria for Adoption ......................................6
   3. Authors/Editors .................................................8
   4. Document History and Stability ..................................8
   5. Some Issues for Consideration ..................................10
      5.1. Individual I-Ds under WG Care .............................10
      5.2. WG Drafts Can Become Individual Drafts ....................11
      5.3. Competing Drafts ..........................................11
   6. Security Considerations ........................................13
   7. Acknowledgements ...............................................13
   8. Informative References .........................................13

1.  Introduction

   The productive output of an IETF working group (WG) is documents, as
   mandated by the working group's charter.  Working groups develop
   these documents based on initial input at varying levels of maturity.
   An initial working group draft might be a document already in wide
   use, or it might be a blank sheet, wholly created by the working
   group, or it might represent any level of maturity in between.  This
   document discusses how a working group typically handles the formal
   documents that it targets for publication.  The discussion applies
   only to the IETF and does not cover IRTF groups, where practices vary
   widely.





Farrel & Crocker              Informational                     [Page 2]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   Within the general constraints of formal IETF process and the
   specific constraints of a working group's charter, there can be
   considerable freedom in the adoption and development of drafts.  As
   with most IETF activities, the ultimate arbiter of such choices is
   working group agreement, within the constraints of its charter.  As
   with most working group management, this agreement might be explicit
   or implicit, depending upon the efficiencies that the group deems
   appropriate.

   NOTE:  This document is intentionally non-normative.  It is meant as
      a guide to common practice, rather than as a formal definition of
      what is permissible.

1.1.  What Is a WG Draft?

   Working group drafts are documents that are subject to IETF working
   group revision control, with advancement for publication as an RFC
   requiring rough consensus in the working group and then in the
   broader IETF.  Creation or adoption of a draft by a working group --
   as well as substantive changes to the document -- need to represent
   working group rough consensus.

   Documents under development in the IETF community are distributed as
   Internet-Drafts (I-Ds) [RFC2026] [ID-Info].  Working groups use this
   mechanism for producing their official output, per Section 7.2 of
   [RFC2418] and Section 6.3 of [Tao].  The common convention for
   identifying an I-D formally under the ownership of a working group is
   by the inclusion of "ietf" in the second field of the I-D filename
   and the working group name in the third field, per Section 7 of
   [ID-Guidelines].  That is:

                          draft-ietf-<wgname>-...

   In contrast, individual submissions are drafts being created and
   pursued outside of a working group, although a working group might
   choose to adopt the draft later, as discussed below.  Anyone is free
   to create an individual submission at any time.  Such documents are
   typically distinguished through the use of the author/editor's last
   name, in the style of:

                           draft-<lastname>-...

   (Also see Section 5.1 for an elaboration on this naming.)

   Responsibility for direct revision of a working group I-D is assigned
   to its editors and authors.  See Section 3 for discussion about their
   selection and role.




Farrel & Crocker              Informational                     [Page 3]

RFC 7221                 Handling of I-Ds by WGs              April 2014


1.2.  Working Group Authority and Consensus

   A premise of the IETF is that, within a working group, it is the
   working group itself that has final authority over the content of its
   documents, within the constraints of the working group's charter.  No
   individual has special authority for the content.  The Chairs assign
   document authors/editors and can formulate design teams, but the
   content of working group documents is always, ultimately, subject to
   working group approval.  Approval is described in terms of the IETF's
   "rough consensus" construct, which is the prime example of the IETF's
   preference for pragmatics over niceties.  Unanimous agreement is
   always desirable, but more approximate (rough) agreement will
   suffice, as long as it is clear and strong.

   Other than for selection of document authors/editors, as discussed in
   Section 3, working group decision-making about document management is
   subject to normal IETF rough consensus rules.  Useful descriptions of
   this process for a working group are in Section 3.3 of [RFC2418] and
   Section 4.2 of [Tao].  Discussion of the nature of rough consensus
   can be found in [Consensus].

   In terms of the IETF's formal rough consensus processes, the working
   group explicitly develops, modifies, reviews, and approves document
   content, according to overt rough consensus.  For difficult topics
   and/or difficult working group dynamics, this laborious process
   really is essential.  Its diligence validates progress at each step
   along the way.  However, working groups often handle simpler matters
   more simply, such as allowing a Chair to assert the likely agreement
   and then merely call for objections.  Ultimately, the mode of working
   group decision-making is determined by the comfort and engagement of
   the working group with the way the decisions are being made.

   At times, a document author/editor can appear to have considerable
   authority over content, but this is (merely) for efficiency.  That
   is, the Chairs can permit authors and editors to proceed with an
   implied (default) working group agreement, as long as the working
   group is comfortable with that mode.  Of course, the benefit in the
   mode is efficiency, but its risk is failure to retain or verify
   actual consensus among the working group participants.  When a
   working group is operating in the mode of active, direct author/
   editor content development, an easy validation method is simply to
   have Chairs query the working group when a new document version
   appears, asking for comments and concerns.








Farrel & Crocker              Informational                     [Page 4]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   In general, when it is not completely obvious what the opinion of the
   working group is, Working Group Chairs can poll the working group to
   find out.  As with any other consensus question, the form in which it
   is asked can make a difference.  In particular, a general 'yes/no'
   question often is not as helpful as asking supporters and detractors
   of a draft -- or of the decision under consideration -- to provide
   their reasons, not merely their preferences.  In effect, this treats
   the matter of consensus as an ongoing discussion.  Ideally, the
   discussion can produce changes in the document or in participant
   views, or both.

1.3.  Questions Considered in This Document

   The purpose of this document is to discuss the criteria and sequence
   typically followed when adopting and developing a formal IETF working
   group document.  Therefore, this document considers the following
   questions that are particularly relevant to Working Group Chairs who
   are charged with running the process:

   *  How do Working Group Chairs decide which drafts to adopt and when?

   *  Is it necessary to poll the working group explicitly, and what
      does a working group poll look like?

   *  How do Working Group Chairs make the decision?

   *  What are the process steps the working group will choose to use,
      for an I-D to become a WG I-D?

   *  Are there any special cases?

   *  Can a document be created as a WG I-D from scratch?

   *  How can competing drafts be handled?

   *  Can an individual I-D be under the care of a WG?

   *  Can a WG I-D become an individual I-D?













Farrel & Crocker              Informational                     [Page 5]

RFC 7221                 Handling of I-Ds by WGs              April 2014


2.  Adoption Sequence

2.1.  Common Steps

   When there is interest in adopting a document as a new working group
   document, the Chairs often:

   1.  Remind current draft owners that they are transferring change
       control for the document to the IETF.  (This is a particularly
       significant point for a document covered by proprietary
       interests, because it typically entails a negotiation between the
       current owners and the IETF, including a formal agreement.)

   2.  Check for known IPR that needs to be disclosed, using some
       technique like those described in [RFC6702].

   3.  Obtain working group rough consensus.

   4.  Choose document editors.

   5.  Instruct authors to post the WG I-D.

   6.  Approve posting [Approval].

   7.  Ensure that the non-working group version of the draft is marked
       as being replaced by this working group version.

   8.  Encourage everyone to enjoy the ensuing working group
       discussion...

2.2.  Criteria for Adoption

   No formal specification for working group 'adoption' of a draft
   exists; the current document is meant to provide a description of
   common activities for this, but again note that it is not normative.

   There are some basic considerations when deciding to adopt a draft:

   *  Is there a charter milestone that explicitly calls for such a
      document?

   *  Is the topic of the I-D within scope for the working group?

   *  Is the purpose of the draft sufficiently clear?

   *  Does the document provide an acceptable platform for continued
      effort by the working group?




Farrel & Crocker              Informational                     [Page 6]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   *  What are the process or technical objections to adoption of the
      draft?

   *  Is the draft likely to be completed in a timely manner?

   *  Does the intended status of the document seem reasonable to the
      working group?

   *  If not already in scope, is a simple modification to the charter
      feasible and warranted?

   *  Does the draft carry known intellectual property rights issues?

   *  Is there strong working group support for working on the draft?

   Adoption has some basic pragmatics:

      Rough consensus:  Working group agreement to adopt is not required
         to be unanimous [RFC2418].

      Initial, not final:  The writing quality is not required to be
         "ready for publication", although writing quality can be a
         problem and does need explicit attention; although not
         mandatory, it is good practice to check whether a new working
         group draft passes [IDNITS].

      Adoption, not approval:  The document is not required to already
         contain a complete and/or sufficient solution, although of
         course this can be helpful.  Equally, adoption by a working
         group does not guarantee publication of the document as an RFC.

      Group, not Chairs:  Concerning the draft, the position of the
         Working Group Chairs has no special authority, except to assess
         working group consensus.

   REMINDER:  Once a working group adopts a draft, the document is owned
      by the working group and can be changed however the working group
      decides, within the bounds of IETF process and the working group
      charter.  Absent explicit agreement, adopting a document does not
      automatically mean that the working group has agreed to all of its
      content.  So a working group (or its charter) might explicitly
      dictate the basis for retaining, removing, or modifying some or
      all of a draft's content, technical details, or the like.
      However, in the absence of such constraints, it is worth having
      the adoption process include a sub-process of gathering working
      group concerns about the existing draft and flagging them
      explicitly.




Farrel & Crocker              Informational                     [Page 7]

RFC 7221                 Handling of I-Ds by WGs              April 2014


3.  Authors/Editors

   Document authors/editors are chosen by the Working Group Chairs.
   Document editors are described in Section 6.3 of [RFC2418].  Authors
   and editors are described in [RFC-Auth-Ed].

   NOTE:  In this document, the terms 'author' and 'editor' are meant
      interchangeably.  Within the IETF, the distinction between an
      'author' and an 'editor' is, at best, subjective.  A simplistic
      rule of thumb is that editors tend to do the mechanics of
      incorporating working group detail, whereas authors tend to create
      the detail, subject to working group approval.  That is, one role
      is more active with the content, and the other is more passive.
      It is a responsibility of the Working Group Chairs to ensure that
      document authors make modifications in accord with working group
      rough consensus.  Authors/editors are solely chosen by the Chairs
      -- although the views of the working group should be considered --
      and are subject to replacement for a variety of reasons, as the
      Chairs see fit.

   For existing documents that are being adopted by a working group,
   there is a special challenge in the selection of document editors.
   Because the document has already had editors, the question "Are the
   same people appropriate for continuing the task?" is asked.
   Sometimes the answer is yes, but this is not automatic.  The process
   within an IETF working group can be quite different from the process
   that created previous versions.  This well might make it appropriate
   to select one or more new editors, either as additions to the editor
   team or as primary pen-holders (effectively reclassifying the
   previous team as coauthors).

   If the original editors are to continue in their role, the Chairs
   might want to ensure that the editors understand IETF working group
   process; it is likely to be quite different from the process that
   developed earlier versions of the document.  If additional or new
   editors are assigned, the transition can be discussed, including its
   reasons; this is best done as soon as possible.

4.  Document History and Stability

   Working group charters sometimes specify an initial set of existing
   documents to use as a basis of the working group's activities.  That
   'basis' can vary considerably, from simple input to working group
   discussion, all the way to an advanced draft adopted by the working
   group and subject only to minimal changes.  The role of a document
   should be explicitly stated in the charter.





Farrel & Crocker              Informational                     [Page 8]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   Within the scope of its charter, a working group is free to create
   new documents.  It is not required that all drafts start as the
   effort of an individual.  Of course, the criteria for brand new
   documents are likely to be the same as for those imported into the
   working group, with the additional and obvious requirement that the
   Working Group Chairs will need to appoint authors/editors before any
   work can progress.  Note that, from time to time, a working group
   will form a design team to produce the first version of a working
   group draft.  Design teams are discussed in Section 6.5 of [RFC2418].

   Work that is brought to the IETF has different levels of completeness
   and maturity, and different timings for having achieved those levels.
   When the IETF charters a group and includes existing material, the
   charter can cast the role of that material in very different ways.
   It can treat it as:

   *  no more than a set of ideas, to be used or ignored;

   *  a basic design, with all of the actual details still fluid;

   *  a rough draft, subject to extensive revision;

   *  a solid specification that merely needs review, refinement, and
      maybe enhancement;

   *  a deployed technology that is best served by trying to protect its
      installed base, but with some tolerance for changes that affect
      interoperability;

   *  a deployed technology for which protecting the installed base is
      essential, including retention of core interoperability.

   These suggest a wide range of possible constraints on working group
   effort.  Technology is brought to the IETF at different points of
   maturity along its life cycle, and the nature of the technology can
   have widely varying utility in developing an Internet standard.

   When technology is brand new, with at most some prototypes done as
   proofs of concept, then significant changes to the specification will
   not necessarily add much to the development and deployment costs.
   However, when the technology is already part of a mature and
   extensive operational deployment, any changes that are incompatible
   are likely to be problematic for that market and can hinder adoption
   of the changes overall.  For example, immediately after the
   development investment is made -- and especially when there has been
   considerable initial deployment but there is still room for quite a
   bit more -- the installed and potential base might not take kindly to
   disruptive standards work that undermines their recent investment.



Farrel & Crocker              Informational                     [Page 9]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   Conversely, even a deployed technology with a solid base might be
   inappropriate to deploy at Internet scale, and while a document
   specifying such a technology might serve as a good starting point on
   which to base a new specification, undermining of the deployed base
   might be completely appropriate.

   In reflecting upon the basis for adopting an existing draft and the
   way it will be used by the working group, it is important to consider
   the document's place in its life cycle, the needs of any installed
   base, and the applicability of the draft's technology, when deciding
   on the constraints to impose on document development.  It will all
   depend on the constraints of the charter and the analysis of the
   working group.

5.  Some Issues for Consideration

5.1.  Individual I-Ds under WG Care

   Sometimes, a working group facilitates a draft but does not own it or
   formally adopt it.  These are "individual" drafts [Individual].

   As noted in Section 1.1 and reinforced in [ID-Guidelines], the
   convention for identifying an I-D formally under the ownership of a
   working group is by following the naming convention:

                          draft-ietf-<wgname>-...

   By contrast, documents that are still under the control of their
   authors are known as "individual" I-Ds.  When these documents are
   intended for consideration by a specific working group, the
   convention is that the document uses the naming convention as
   follows, where the second element is the last name of one of the
   principal authors.

                       draft-<lastname>-<wgname>...

   Having the working group name following the personal name allows
   tools to associate these drafts with the working group, even though
   the filename identifies them as the work of individuals.

   The working group can choose to apply any of its normal, internal
   working group process management mechanisms to an individual I-D.
   However, matters of ownership, working group final approval, and the
   like are all subject to negotiation amongst the document authors,
   working group, and Area Directors.






Farrel & Crocker              Informational                    [Page 10]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   This is a rare situation, and Working Group Chairs can be assured
   that the Area Directors will want to understand why the document
   could not be adopted and owned by the working group.

5.2.  WG Drafts Can Become Individual Drafts

   A working group is not obligated to retain documents it has adopted.
   Sometimes working group efforts conclude that a draft is no longer
   appropriate for working group effort.  If a working group drops a
   draft, then anyone is permitted to pursue it as an Individual or
   Independent Submission, subject to the document's existing copyright
   constraints.

5.3.  Competing Drafts

   Engineering for interesting topics often produces competing,
   interesting proposals.  The reasons can be technical aesthetics,
   engineering trade-offs, architectural differences, company economics,
   and the like.  Although it is far more comfortable to entertain only
   one proposal, a working group is free to pursue more than one.  Often
   this is necessary until a clear preference develops.  Sometimes,
   multiple versions are formally published, absent consensus among the
   alternatives.

   It is appealing to ask authors of competing proposals to find a way
   to merge their work.  Where it makes sense to do this, it can produce
   a single, strong specification.  The detailed discussions to merge
   are often better held in a design team than amidst the dynamics of an
   open working group mailing list.  The working group has ultimate
   authority over any decisions, but it is not required that it be
   involved in all the discussions.

   On the other hand, some differences cannot be resolved, and
   attempting a merge can produce a weaker result.  An example of this
   problem of conflicting design goals is discussed in [Heli-Sub],
   noting:

      "Helicopters are great, and so are submarines.  The problem is
      that if you try to build one vehicle to perform two fundamentally
      different jobs, you're going to get a vehicle that does neither
      job well."










Farrel & Crocker              Informational                    [Page 11]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   Various management efforts can facilitate the handling of competing
   proposals.  Some examples include:

   *  Developing a requirements document that is independent of specific
      proposals; this can highlight features that are deemed essential
      and distinguish them from features that are of secondary
      importance, and can facilitate a discussion about features without
      reference to specific proposals.

   *  Developing a comparison table of the proposals; this can aid
      understanding of their differences.

   *  Discussing the relative importance and effects of having one
      proposal, versus multiple; this can focus people's efforts at
      compromise and encourage a willingness to choose a single
      proposal.

   The problem of competing drafts can be particularly painful when it
   arises in either of two circumstances:

   *  If a second proposal appears as a new draft, just as the Chairs
      were ready to poll the working group on adoption of the draft
      containing the first proposal, then the authors of the first
      proposal could feel affronted.  It does not follow that the second
      draft was written to be difficult or derail the first: it might
      even include better ideas.  So it is best not to disregard it.
      However, automatically asking the authors to merge their work will
      not necessarily produce a more solid solution and will not
      guarantee faster progress.  This situation will be a judgement
      call in each case, and it might help to ask the working group for
      their opinion: shall the working group adopt one document as a
      starting point and fold in the ideas from the second under the
      control of consensus, or shall the working group wait until the
      authors of both documents have reached agreement?

   *  If the working group has already adopted an I-D on a specific
      topic, the posting of a new individual I-D on the same topic could
      be seen as an attack on the working group processes or decisions.
      However, posting an I-D is often a good way to put new ideas into
      concrete form, for public consideration and discussion.  The
      Working Group Chairs will want to encourage the working group to
      consider the new proposal.  Shall it be adopted and entirely
      replace the current working group draft?  Shall the new ideas be
      incorporated into the work of the working group through the normal
      editorial process?  Shall the working group adopt a second
      competing solution?  Or shall the new draft be rejected and not
      adopted by the working group?




Farrel & Crocker              Informational                    [Page 12]

RFC 7221                 Handling of I-Ds by WGs              April 2014


6.  Security Considerations

   Beyond the credibility of the IETF, this document raises no security
   concerns.

7.  Acknowledgements

   This document was developed from an IETF tutorial given by A. Farrel
   at an IETF Working Group Chairs lunch [Farrel-Chairs].  L. Anderson
   contributed useful comments.

8.  Informative References

   [Approval] IETF, "IETF Internet-Draft Initial Version Approval
              Tracker", (IETF Datatracker),
              <https://datatracker.ietf.org/
              cgi-bin/wg/wg_init_rev_approval.cgi>.

   [Consensus]
              Resnick, P., "On Consensus and Humming in the IETF", Work
              in Progress, April 2014.

   [Farrel-Chairs]
              Farrel, A., "What is a Working Group ID (and when to adopt
              one)", (IETF 78 WG chairs lunch Material), July 2010,
              <http://wiki.tools.ietf.org/group/edu/wiki/IETF78#>.

   [Heli-Sub]
              Rose, M., "On Helicopters and Submarines", ACM Queue -
              Instant Messaging, Vol. 1, Issue 8, Page 10,
              <http://dl.acm.org/ft_gateway.cfm?id=966726>.

   [ID-Guidelines]
              Housley, R., Ed., "Guidelines to Authors of Internet-
              Drafts", December 2010,
              <http://www.ietf.org/ietf-ftp/1id-guidelines.txt>.

   [ID-Info]  Wijnen, B., Ed., "Checklist for Internet-Drafts (IDs)
              submitted for RFC publication", May 2009,
              <https://www.ietf.org/id-info/checklist.html>.

   [IDNITS]   IETF, "IDNITS Tool", 2013,
              <https://tools.ietf.org/tools/idnits/>.

   [Individual]
              IESG, "Guidance on Area Director Sponsoring of Documents",
              March 2007, <http://www.ietf.org/iesg/statement/
              ad-sponsoring-docs.html>.



Farrel & Crocker              Informational                    [Page 13]

RFC 7221                 Handling of I-Ds by WGs              April 2014


   [RFC-Auth-Ed]
              RFC Editor, "RFC Editorial Guidelines and Procedures --
              Author Overload", 2014,
              <http://www.rfc-editor.org/policy.html#policy.authlist>.

   [RFC2026]  Bradner, S., "The Internet Standards Process --
              Revision 3", BCP 9, RFC 2026, October 1996.

   [RFC2418]  Bradner, S., "IETF Working Group Guidelines and
              Procedures", BCP 25, RFC 2418, September 1998.

   [RFC6702]  Polk, T. and P. Saint-Andre, "Promoting Compliance with
              Intellectual Property Rights (IPR) Disclosure Rules",
              RFC 6702, August 2012.

   [Tao]      Hoffman, P., Ed., "The Tao of IETF - A Novice's Guide to
              the Internet Engineering Task Force", 2012,
              <http://www.ietf.org/tao.html>.

Authors' Addresses

   Adrian Farrel
   Juniper Networks

   EMail: adrian@olddog.co.uk


   Dave Crocker (editor)
   Brandenburg InternetWorking
   675 Spruce Drive
   Sunnyvale, CA  94086
   USA

   Phone: +1.408.246.8253
   EMail: dcrocker@bbiw.net
















Farrel & Crocker              Informational                    [Page 14]



ERRATA